May 25, 2016 – The following table details the construction projects for the Quad Cities Area as of May 25, 2016:
Mississippi River (Iowa/Illinois) Bridge Location |
Restriction |
Timeline |
Status |
---|---|---|---|
I-74 Mississippi River (Iowa/Illinois) |
Annual roadway patching (Iowa). Nighttime lane closures. |
Fall 2016 |
Contracted |
Repairs to bridge viaduct structures, Illinois side from the river bridge to the end of the viaduct, just south of 7th Avenue. Lane closures in each direction. Ramp closures at River Drive (IL) and State Street entrance ramp (IA) in first stage; following completion, ramp closure at 7th Avenue (IL) entrance and exit ramps in the third/last stage. |
March-mid-August 2016 |
Underway |
|
Annual bridge washing. Nighttime lane closures. Washing approach structures Illinois and Iowa sides, Mississippi River Bridge, following completion of the above project. |
Following Repairs 2016 |
Contracted (IL) |
|
I-80 Mississippi River (Iowa/Illinois) |
Annual roadway patching (Iowa). Nighttime lane closures. |
Fall 2016 |
Contracted |
Bridge Deck Overlay at the I-80 bridge over Wells Ferry Road located 4 miles west of the Miss. Ri. Bridge. One lane closed in each direction. |
Now thru Fall 2016 |
Contracted |
|
Annual bridge washing. Nighttime lane closures. |
early September 2016 |
Contracted |
|
I-280 Mississippi River (Iowa/Illinois) |
Annual roadway patching (Iowa). Nighttime lane closures. |
Fall 2016 |
Contracted |
Annual bridge washing. Nighttime lane closures. |
September 2016 |
Contracted |
|
U.S. 67 Centennial Bridge Mississippi River (Iowa/Illinois) |
Sidewalk painting. Sidewalk closure 4-5 consecutive days anticipated. |
TBA 2016 |
— |
Annual bridge washing. Nighttime lane closures. |
May 24-27, 2016 |
Contracted |
|
Government Bridge Mississippi River (Rock Island Arsenal/Iowa DOT), and Moline Arsenal Bridge |
Government Bridge Swing span gives right-of-way to river barge traffic. Expect periodic vehicular, bicycle, and pedestrian delays. Commercial river traffic asked to voluntarily delay locking through between 5:30 - 7:00 a.m. and 2:45 - 4:15 p.m. |
March – December 2016 |
Seasonal |
Upgrade of railroad hydraulic components work will necessitate complete roadway closures on two different weekends. Duration and timing TBD. Impacts to pedestrian traffic will be minimized. |
Planned July-September 2016 |
Contracted |
|
Special inspection of several bridge components. Intermittent one-line closures are expected throughout timeframe. Pedestrian traffic may be restricted to a single sidewalk at various times. |
April-August 2016 |
Started |
|
Bridge drain flushing (Government Bridge, R.I. Viaduct, & Moline Arsenal Bridge). Intermittent one-lane closures. |
Quarterly 2016 (Start April) |
– |
|
I-80 (Rock River) |
Reconstruction from I-88 to Rock River, including bridge replacement. Crossover with one lane in each direction in 2016 and 2017. |
March 2016 – November 2017 |
Underway |
IL 92, U.S. 67, I-74 (Illinois) at Rock River, Veterans Memorial Bridge at Carr’s Crossing |
No work anticipated. |
– |
– |